• Project Name
  • Jains Carlton Creek - Gachibowli, beside Delhi Public School 
  • Project Description
  • Evoking a grander era, where a life of privilege was the birthright of the few, this ultra-indulgent residential offering sprawls over 13 acres and houses a distinctive selection of around 1664 apartments aligned on basement plus stilt plus first level car park plus 13 floors and occupies 11 impressive blocks. Every apartment modeled as a holiday getaway-cum-home and lounges comfortably over 944 to 2566 sq.ft.
     
  • Amenities
    • Entertainment 
      •           Multipurpose Hall
      •           Amphi Theatre – out door
      •           Mini Theatre
      •           Club House 
      •           Party Lawn – out door6
      •           Senior Citizen’s Corner – out door
      •           Food 
      •           Restaurants/Coffee Shop
       
       Fitness
      •           Gymnasium
      •           Sauna, Steam & Jacuzzi
      •           Aerobics/yoga
      •           Jogging Track – out door  
      •           Fitness Area – out door
       
      Sports
      •           Billiards
      •           Table Tennis
      •           Squash Court 
      •           Basket ball post – out door
      •           Outdoor Badminton court/Shuttle court
      •           Swimming pool 
       
      Children
      •           Children’s play area – out door
      •           Amusement Arcade/Indoor games
       
      Other Amenities
      •           Guest Rooms to stay
      •           Laundromat
      •           Florist 
      •           ATM
      •           Medical store
      •           Play school/Creche
      •           Unisex saloon
      •           Super market/ Convenience store
      •           Library
       
     
  • No of Flats
  • 1664 
  • No of Blocks
  • 11 
  • No of Floors
  • Basement + Stilt + Firstfloor + 13floor  
  • No of Bed Rooms
  • 2BHK, 3BHK & 3 1/2 BHK  
  • Completion date
  • Towers (A, K & J):- December 2016 + 3 months grace / Towers (I & H):- December 2016 + 3 months grace / Towers(B & D):- June 2018 + 3 months grace 
  • Investment Range
  • 2 BHK - 51 Lacs to 68 Lacs / 3 BHK - 69 Lacs to 1.10 Cr. / 3 BHK + study - 1.10 Cr. to 1.20 Cr. 
  • Status
  • Under Construction 
  • Location Map
  •       
      
  • Virtual Tour
  •  
      

  • Specification
  • Flooring     

    a) The flooring in living, dining, bedrooms and kitchen will be of Vitrified tiles. The flooring in balconies, toilets &  wash area will be of first quality anti skid ceramic tiles.
    b) Ceramic tile dadoing up to 7’-0” ht in toilets.
    c)  Vitrified flooring in common area, lift lobby & entrance lobby.
    d) Ground floor lobby will be provided with Granite/Marble flooring
     
    Doors and Main Door windows
    a) Teak wood door frame and panelled skin shutter with melamine polish on both sides.
    b) Brass/SS hardwares 
     
    Internal Doors
    a) Teak wood frame with flush shutters with enamel paint.
    b) UPVC /Anodized sliding folding glazed doors in balcony without grill.
    c) Toilet doors will be made of teak wood frame with flush shutter. One side of the door will have PVC lamination  for suitable height for sintex PVC doors or equivalent.
     
    Windows
    a) UPVC/Anodized aluminum openable/sliding windows with grill.
    b) Anodized aluminum windows with sliding shutter for kitchen and anodized aluminum ventilator for toilets will be provided. 
     
    Kitchen
    a) Kitchen will be designed to suit modular kitchen (only electrical/plumbing points will be provided)”
    b) Piped Gas connection with gas leakage detector.
    c) Provision for Aqua guard point in kitchen area.
    d) Black granite of size 8’0”x2’0” will be provided.
    e) RCC platform can be provided on request.
    f) Stainless steel sink/equivalent without a drain board will be provided.
    g) One loft of RCC will be provided.   
     
    Wall Tiling
    a) Kitchen will have first quality ceramic wall tiles for 2 feet above the platform.
    b) Toilet will have first quality ceramic wall tiles for 7 feet height from floor level.
    c) False ceiling provided in all bath rooms.
    d) Service areas will have ceramic tile for 3 feet height.
     
    Electrical Installations
    a) Three-phase supply with concealed wiring will be provided. The actual supply will be single or three phases based on the EB rules and regulations at the time of energizing the complex.
    b) Separate meter will be provided for each flat in the main board located outside the flat at the place of our choice.
    c) Common meters will be provided for common services in the main board.
    d) In 3 bedroom apartment- A/C provision with electrification will be provided in two bedrooms and only pipeprovision in the third bedroom.
    e) In 2 bedroom apartment- A/C provision with electrification will be provided in one bedroom and only pipe provision in the second bedroom.
    d) 15A plug points will be provided for Refrigerator, Washing machine and Geyser in toilets.
    e) The wiring for 5A points will be of 1.5sq.mm rating adequate for equipments of capacity of 750W and 15A  points  will  be 2.5 sq.mm rating adequate for equipments of capacity of 1500W.AC Wiring will be of 4 sq.mm  which can take  up  a capacity of 2 tones.
    f) Standby generator for min. essential points inside all   apartments and for essential points in common areas will  be     provided.
     
    TV and Telephone Cable
    a) TV and Telephone points will be provided in Living and Master bedroom.
    b) The cables for TV and Telephone will be provided at a suitable location in living.
     
     Sanitary Sanitary fittings and Plumbing
    a) All toilets will be provided with wall mounted closet.  
    b) Dining will be provided with designer washbasin.
    c) High quality chromium plated fittings will be provided in toilets & kitchen.
     
     Water supply
    a) An overhead tank of required capacity will be provided for bore well and metro water.
    b) Deep bore wells will be provided. The depth will be decided by us based on the yield.
    c) Two lifts/core of Johnson/OTIS/Schindler or equivalent make will be provided.
    d) Sump of required capacity for metro water and bore water will be provided.
     
     Sewage
    a) All waste water from Kitchen, Toilet and Laundry wash will be treated as per the pollution norms.
    b) MS railing for Staircase and Balconies.
     
    Fire Safety
    a) Fire Water Tank & Fire pumps will be provided.
    b) Fire Hydrant etc., as per norms.
     
    Common Amenities
    a) Car Park will be provided at extra cost.
     
    Salient Features
    a) The Luxuriant landscape provides the perfect setting for Carlton creeks’ many features & facilities which includes a grand entry with feature walls & trellis.
    b) As befitting a development of this stature there stands an exclusive amenities block with club house with fully equipped gymnasium, mini theater & multipurpose halls for important family functions. Amenities block also houses all  the  facilities that a family needs in a day to day life.  
    c) Professionally Landscaped podium gardens keep the campus ‘vehicle free’ providing a safe environment for  the  children.
    d) Abundant greenery for a pollution free ambience, assuring your family completely ‘stress free’ living for generations.
    e) The upper floor lobbies are accessed through a lift and a staircase and are welcomed by intricately crafted  main  doors   of apartments.
    f)  An Army of trained security personnel is on alert round the clock for safety.
    g) The facilities and amenities are planned and designed in Carlton Creek in order to provide the residents luxurious  & a pure living experience.

     

     
  • Payment plan
  • I. PRE EMI PLAN:
    On Booking Rs.1,00,000/-
    Within 15days 20%
    Note: On payment of 20%, Sale Agreement shall be executed and accordingly, Home Loan should be processed.
    II. REGULAR PLAN:
    On Booking Rs.100000
    Within 10 days 10%
    Within 30 days 20%
    On completion of 1st floor roof slab 10%
    On completion of 3rd floor roof slab 10%
    On completion of 5th floor roof slab 10%
    On completion of 7th floor roof slab 10%
    On completion of 10th floor roof slab 10%
    On completion of 13th floor roof slab 10%
    On completion of flooring 5%
    During Handing over 5%
    Note:
  • Cheque in favor of JAIN HOUSING & CONSTRUCTIONS LTD
  • Registration charges, VAT, Service tax as per Govt prevailing rates
  • Rates will be confirmed at the time of booking
  • Service tax will be collected on pro rata basis with every payment. VAT at the time of registration or as applicable government rules
  • The project is approved by all major banks and easy loan facility is available from the banks.

     
  • Quick Contact :

    Hyderabad : Ph:86860 45959

    E-Mail: hydmarketing@jainhousing.com

    If you are unsatisfied with the response of any of our executives or require any further information,
    Please write to: feedback@jainhousing.co.in